One contract. One team. No gap to fall into.

Building in Abuja has a reputation for surprises. Our process exists to remove them: a fixed price before each stage, a named deliverable at the end of it, and the same people from the first meeting to the return visit a year after you move in.

Principles

Principle 01

The finish is drawn first.

We design from the surface inward. Where the terrazzo meets the door frame is decided before the foundation is set out, because that junction is what you will look at every day.

Principle 02

Nothing starts unpriced.

Each stage has a fixed fee agreed before it begins. Changes are priced in writing before they are made. You will never receive a bill you have not already seen.

Principle 03

We stay responsible.

The workshop and the site are one company under one contract. If something is wrong, there is one phone number to call, and it is ours.

The five stages

From brief to return visit

  1. 01

    Brief & survey

    A visit to the site or the room, a measured survey, and a long conversation about how you live and what you want the building to do for you. We write the brief; you correct it until it is right.

    You receive
    A written brief, a measured survey, an outline budget range and a programme estimate
    Duration
    One to two weeks
    We need from you
    Access to the site, title or lease documents, any existing drawings, and honesty about the budget
    Fee
    Fixed, credited against Stage 2 if you proceed
  2. 02

    Design & detailing

    Plans, sections and elevations, then the drawings that matter most: the junctions. Every place two materials meet is drawn at full size. You see physical samples of every finish before you approve it.

    You receive
    A coordinated drawing set, a finishes schedule with samples, and structural design where required
    Duration
    Three to six weeks, depending on scale
    We need from you
    Decisions, at a pace we agree at the start. Two review meetings are built in
    Working with your architect
    Gladly. We then produce the detailing and the workshop drawings only
  3. 03

    Costing & programme

    An itemised bill of quantities priced from the drawings, a fixed contract sum, and a week-by-week programme. Material prices in Nigeria move; our contract says exactly how that is handled, and it is not by surprise.

    You receive
    A fixed contract sum, an itemised bill, a payment schedule tied to milestones and a dated programme
    Duration
    Two weeks
    Contract
    A plain-language building contract; we recommend you have it reviewed
    Development permit
    We prepare and submit the FCDA application on your behalf
  4. 04

    Build

    Our site team, our workshop, our foreman. The workshop starts on joinery and cast pieces while the structure is still going up, so fixings are cast in rather than drilled after. You get a written report every Friday with photographs.

    You receive
    Weekly written reports, a fortnightly site walk, and a decision log so nothing is agreed only verbally
    Duration
    Set in Stage 3. A typical house: 10–16 months
    Site standards
    Hoarding, welfare, PPE and a named safety lead on every site
    Changes
    Priced and signed before they are made, without exception
  5. 05

    Finish & handover

    The stage the company is named for. Snagging is done in daylight with you present. We hand over a care guide for every finish in the building, and we come back at twelve months to see how it has settled and put right anything that has moved.

    You receive
    A snag-free building, as-built drawings, a materials care guide and a twelve-month return visit
    Duration
    Two to four weeks
    Retention
    Five percent held until the return visit, released when you are satisfied
    After that
    Re-sealing, re-washing and repairs available on a call-out basis

Fit

We are the right builder for some projects and the wrong one for others.

It is better to say so at the first meeting than at the fourth.

A good fit

  • Private houses, from one room to a whole compound
  • Offices, showrooms, restaurants and guest houses
  • Renovation of buildings worth keeping
  • Joinery and finishes commissioned on their own
  • Clients who want to be involved

Not a good fit

  • Estates of repeated units built to a price
  • Civil engineering, roads or infrastructure
  • Projects where the finish will be someone else's
  • Timelines that require skipping the drawing stage
  • Work outside the FCT, for now

Assurance

What stands behind the handshake

Registration, insurance and a written contract are the minimum. The rest is a habit of writing things down.

  • Registered company

    Amazeno Craftsmanship Ltd, RC 8009349, registered with the Corporate Affairs Commission.

  • Insured

    Contractors' all-risk and public liability cover on every site; certificates provided before we start.

  • Written contract

    A plain-language building contract with a fixed sum, milestone payments and a defined change procedure.

  • References on request

    Past clients will speak to you, and you may visit finished projects with their permission.

Stage one

The first meeting is free, takes an hour, and commits you to nothing.